-
- home > news > products > 2017
-
End of Life Notification for VPD-133, VPD-133N
- EOL notification date: 2017/11/17
Phased out model: VPD-130, VPD-130N
Last Order Date: Subject to availability (limited in quantity while stocks last)
Dear Partners,
ICP DAS hereby formally announces the manufacturing discontinue and End of Life (EOL) of VPD-133 and VPD-133N.
Within the effective warranty period, ICP DAS is committed to continue providing comprehensive after-sales service and technical support.
● Reason for termination: Phase out of MCU
● Suggested replacement device: VPD-133-H, VPD-133N-H
- Status: Available
- Please refer to the following table for cross reference information. -
Model NameVPD-133VPD-133NVPD-133-HVPD-133N-HProduct StatusPhased outAvailableCPU32-bit RISC CPU32-bit RISC CPUMiniOS8Yes (update required)-Memory Expansion16 MB SDRAM/8 MB Flash16 MB SDRAM/16 MB FlashReal Time Clock (RTC)YesYesBuzzerYesYesRotary Switch (0~9)YesYesLCD3.5 TFT (Resolution 240 x 320, 65536 colors)3.5 TFT (Resolution 240 x 320, 65536 colors)Serial PortCOM1RS-485+RS-232RS-485+RS-232COM2RS-485RS-485Firmware updatesUSB 1.1 ClientUSB 1.1 Client or EthernetI/O Expansion BusYesYesRubber Keypad5 keys (Programmable)-5 keys (Programmable)-Reset ButtonYesYesEthernetRJ-45 x 1, 10/100 Base-TXRJ-45 x 1, 10/100 Base-TXPower Input+12 ~ 48 VDC or PoE+12 ~ 48 VDC or PoE
-
Migrating projects from VPD-133/133N to VPD-133-H/133N-H:
1. Open original project by using HMIWorks v2.10.22 or last version.
2. Click the HMIWorks menu item "Project/ Project Configuration". - 3. Click the "General" page and select the “VPD” option.
4. Change the "TouchPAD Type" to VPD-133-H. - If your original project uses Ladder program, and is created by HMIWorks v2.09.09 or older versions, please follow the steps 5 - 6 to disable the new Ladder mode.
New ladder mode: The Coil-Set and Coil-Reset change the coil state and lock it (industrial standard) until reset or set. Other coil operations will not unlock or change it.
Old ladder mode: There is no lock feature.
5. Click the "Others" page.
6. Unchecked the "Use New Ladder Implementation” item in the “Ladder” pane.
7. Click "OK" button. - 8. Click the HMIWorks menu item "Run/Build (Render, Compile)" to rebuild project or press F5.
-
For more information, please visit the link below:
http://www.icpdas.com/root/product/solutions/hmi_touch_monitor/touchpad/vpd-130-h.html